The Kalzas Project is located on the Kalzas Plateau in central Yukon Territory, Canada, south of the Stewart River, approximately 70 km southeast of Mayo and 290 km north of Whitehorse. 

​​

The property is accessible from Whitehorse to Mayo, via the Klondike Highway to Stewart Crossing, then north along the Silver Trail Highway (Yukon Highway 11), followed by a 30-minute flight from Mayo to the Project site. Alternatively, the Project can be accessed directly by helicopter from Whitehorse.

Kalzas Project location_edited.png

OWNERSHIP AND MINERAL RIGHTS

Rio2 Limited controls 100% of the Kalzas Tungsten Project.​

 

The Kalzas Tungsten Project (the “Kalzas Project”) consists of eight quartz mineral claims totalling approximately 155 hectares, situated within the Selkirk First Nation Settlement Land Block SFN-R-16A.

​​

The claims are active and verified as in good standing.

Kalzas - Ownership and Mineral rights.png
Claim Name
Staking Date
Expire Date
NTS Map
Area (m²)
Pat
11/08/1978
27/08/2027
105M07
209.198
Blackie
11/08/1978
27/08/2027
105M07
209.196
David
11/08/1978
27/08/2027
105M07
209.199
Wolf 1
29/08/1980
08/02/2031
105M07
209.731
Wolf 2
29/08/1980
08/02/2031
105M07
178.759
Wolf 4
29/08/1980
08/02/2031
105M07
209.195
Wolf 7
09/07/1990
08/02/2031
105M07
209.202
Wolf 9
09/07/1990
08/02/2031
105M07
122.933

PROJECT OWNERSHIP HISTORY

Period Owner
Operator
Key Activities
1978
J.D. Randolph
Discovery and staking
1980–1984
Union Carbide Corporation
Geological mapping, geochemical sampling,
trenching, diamond drilling
2001–2006
Copper Ridge Exploration Inc.
Resampling, geological mapping, diamond drilling
2007–2016
Prospector Resources Corp.
Option acquisition, diamond drilling, technical report
2017–present
Rio2 Limited
Acquisition of Prospector Resources Corp., claim maintenance

NI 43-101 TECHNICAL REPORT FOR THE KALZAS TUNGSTEN PROJECT, YUKON, CANADA​

REGIONAL GEOLOGY

Kalzas Regional Geology.png

The Kalzas Project is located within the Selwyn Basin, a northeast‑trending sedimentary basin hosting Proterozoic to Jurassic strata later intruded by mid‑Cretaceous S‑type granitic bodies that define the regional metallogenic framework.

​

The project lies within the 640‑km‑long Selwyn Tungsten Belt, a major tungsten‑bearing arc coincident with a pronounced facies transition from shallow‑water carbonates to fine clastic units, underlain by Proterozoic clastic‑grit rocks and overlain by Silurian–Mississippian shale, argillite, conglomerate, and quartzite.

​

Regional deformation reflects late Jurassic to Early Cretaceous terrane collision, producing imbricate thrusting, folding, and slaty cleavage; however, the Kalzasarea, situated within the Robert Service thrust sheet, remains distal from the main thrust plane and exhibits only moderate structural overprinting.

Mid to late Cretaceous intrusive stocks throughout the belt generated hornfels‑grade contact aureoles up to ~1.6 km wide, and where these intrusions intersect calcareous units, well‑developed skarn systems host scheelite mineralization within diopside‑ and garnet‑rich assemblages accompanied by tremolite, actinolite, epidote, calcite, sulphide replacement minerals, and quartz‑scheelite vein networks.

​

This geological environment positions the Kalzas Project as a compelling exploration opportunity within one of Canada’s most significant tungsten‑bearing districts.

LOCAL GEOLOGY

The Kalzas Project hosts a large, intrusion‑related tungsten system with strong geological continuity and a well‑defined geochemical footprint. Tungsten mineralization, occurring as wolframite and scheelite, is associated with an extensive quartz‑vein stockwork developed within quartzites of the mid Cretaceous Yusezyu Formation.

 

The mineralizing event is linked to regional igneous activity dated at 90.9 ± 1.4 Ma (K/Ar), part of the Tombstone intrusive suite, a recognized driver of tungsten‑bearing systems in the Yukon. 

​

 

Geochemistry: Extensive historical surface work has outlined a robust tungsten halo exceeding 1,000 ppm W across an area of approximately 1,500 m by 800 m, demonstrating both scale and consistency. Programs conducted by Union Carbide (1981–1984) and later by Copper Ridge (2001–2002) confirmed a continuous tungsten anomaly in soils and talus fines, extending 1.5 km northeast with widths ranging from 300 to 900 m—a signature typical of large, intrusion‑related tungsten systems.

​

Historical trenching returned high‑grade tungsten values, including:

  • 1.04% WO₃ over 150 m (Union Carbide)

  • 3.165% WO₃ over 0.4 m and 2.552% WO₃ over 2 m (Copper Ridge)

​

These results highlight the presence of structurally controlled, high‑grade zones trending west‑northwest and preferentially hosted in quartzite units.

​

Overall, Kalzas presents a compelling exploration opportunity: a large, well‑defined tungsten system, strong historical grades, and clear geological controls that support the potential for resource delineation and future development.

DRILLING

FIGURE 3- Kalzas Project drill hole locations.png

Diamond drill programs at the Kalzas Tungsten Project were completed over three exploration phases between 1983 and 2008 by Union Carbide, Copper Ridge Exploration Inc., and Prospector Resources Corp., with the objective of testing the extent, continuity, and depth potential of tungsten mineralization identified at surface through geochemical sampling.

 

The most recent drilling campaign was completed in 2008 and was reported in the 2016 Technical Report prepared for Prospector Resources Corp. by Allan Doherty.

​​

Drill core samples were analyzed by Acme Analytical Laboratories Ltd. of Vancouver, British Columbia (now operating as Bureau Veritas). Sample intervals ranged from as short as 20 cm, where individual quartz veins were sampled, to approximately 3 m in unmineralized siltstone. Multi-element trace element analysis was completed using the 1DX method, with tungsten assays completed using the W-7KP analytical method (phosphoric acid leach with ICP-ES determination).

Selected Drill Results

Hole
From (m)
To (m)
Interval (m)
WO₃(%)
KZ05-01
11
59
48
0.153
includes
29.6
41
11.4
0.304
and
29.6
38
8.4
0.393
and
29.6
32
2.4
0.688
and
36.1
38
1.9
1.122
KZ05-02
33
62
29
0.13
includes
50
52.1
2.1
0.391
KZ05-03
3
11
8
0.246
includes
28
30
2
0.24
49.2
53.8
4.6
0.26
KZ05-04
16
21.5
5.5
0.221
64.9
84.7
19.8
0.145
includes
64.9
68.5
3.6
0.231
KZ05-05
0
24.4
24.4
0.304
includes
7
14
7
0.419
and
9
17.4
8.4
0.533
and
9.8
10.3
0.5
1.22
and
16.9
17.4
0.5
1.39
58.4
60
1.6
0.38
84
85
1
0.72

Selected Hole Collars

Hole
Type
Easting
Northing
Length (m)
Azimuth
Dip
Year
Company
83K-1
BQ
514859
7015366
254.2
180
-60
1983
Union Carbide_Corp.
83K-2
NQ/BQ
514990
7015366
413.6
180
-60
1983
Union Carbide_Corp.
KZ05-01
BQ
514958
7015240
66.5
250
-45
2005
Copper Ridge
KZ05-02
BQ
514939
7015221
62
250
-45
2005
Copper Ridge
KZ05-03
BQ
514906
7015195
79.31
50
-45
2005
Copper Ridge
KZ05-04
BQ
514878
7015273
89.02
140
-45
2005
Copper Ridge
KZ05-05
BQ
514748
7015273
100.61
232
-45
2005
Copper Ridge
K-08-08
NQ
514920
7015435
68.58
180
-60
2008
Prospector_Resources
K-08-09
NQ
514665
7015328
141.3
150
-60
2008
Prospector_Resources
K-08-10
NQ
514750
7015346
103.15
180
-60
2008
Prospector_Resources
K-08-11
NQ
514831
7015319
192.02
200
-50
2008
Prospector_Resources